Layer 3May – Sep 2026

Website migration for an employment-support organisation

Live again after 20 minutesVerified of downtime — without losing a single URL.

Chosen from 93 applicantsVerified on the strength of the proposal. I moved the site from its old theme (TCD NANO) to SWELL and restructured it around remote-work support.

What the migration preserved

Quality built into the process

  • An application call-to-action inserted automatically into all 213 articlesVerified — without touching the article bodies
  • A Docker test environment and automated checks with Playwright
  • 3 operations manualsVerified
  • An iOS Safari-only layout bug fixed at the root by reworking the layout structure

Downtime at launch was 20 minutesVerified — under 1/6Approx. of the original 2–4 hourApprox. estimate.